Our Projects
Installation of BMU in hotel
Europe
Applied in 2016
50 mof height



Technical challenge
The installation of a BMU (building maintenance unit) was required years after the construction of the building. For this reason, our engineers had to work with a roof full of obstacles (chimneys, ventilation columns, elevator shaft…) which made it difficult to design a rail system for the machine to move on.
Our solution

Technical challenge
The installation of a BMU (building maintenance unit) was required years after the construction of the building. For this reason, our engineers had to work with a roof full of obstacles (chimneys, ventilation columns, elevator shaft…) which made it difficult to design a rail system for the machine to move on.
Our solution
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units






