Our Projects
Our Projects
Our Projects
BMU Model GPN
USA
Applied in 2019
120 mof height






Technical challenge
The project required the replacement of two existing machines that operated without rails and parked in a garage with reduced dimensions. Being a constructed building, it required that the design of the machines be made with parts of appropriate size and weight to lift them by the building's elevator.
Our solution

Technical challenge
The project required the replacement of two existing machines that operated without rails and parked in a garage with reduced dimensions. Being a constructed building, it required that the design of the machines be made with parts of appropriate size and weight to lift them by the building's elevator.
Our solution

Technical challenge
The project required the replacement of two existing machines that operated without rails and parked in a garage with reduced dimensions. Being a constructed building, it required that the design of the machines be made with parts of appropriate size and weight to lift them by the building's elevator.
Our solution
Latest projects
See projects
See projects
See projects
GCM

Europe
2014
60 m
GCM

Europe
2014
60 m
GCM

Europe
2014
60 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPIT

USA
2024
110 m
BMU Model GPIT

USA
2024
110 m
BMU Model GPIT

USA
2024
110 m
DAVITS Model GPP

Spain
2016
20 m
DAVITS Model GPP

Spain
2016
20 m
DAVITS Model GPP

Spain
2016
20 m
Gantry Model GT

Ireland
2017
50 m
Gantry Model GT

Ireland
2017
50 m
Gantry Model GT

Ireland
2017
50 m
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units

