Our Projects
Our Projects
Our Projects
GCM
Europe
Applied in 2014
60 mof height






Technical challenge
The engineering solution for the facade maintenance of this building required a machine with a narrow track, small radius curves, no maneuvering space, and light enough to work with an interchangeable platform among several machines. This type of system can work on both rails or concrete tracks.
Our solution

Technical challenge
The engineering solution for the facade maintenance of this building required a machine with a narrow track, small radius curves, no maneuvering space, and light enough to work with an interchangeable platform among several machines. This type of system can work on both rails or concrete tracks.
Our solution

Technical challenge
The engineering solution for the facade maintenance of this building required a machine with a narrow track, small radius curves, no maneuvering space, and light enough to work with an interchangeable platform among several machines. This type of system can work on both rails or concrete tracks.
Our solution
Latest projects
See projects
See projects
See projects
BMU Model GPN

USA
2019
120 m
BMU Model GPN

USA
2019
120 m
BMU Model GPN

USA
2019
120 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPI

Belgium
2023
60 m
BMU Model GPIT

USA
2024
110 m
BMU Model GPIT

USA
2024
110 m
BMU Model GPIT

USA
2024
110 m
DAVITS Model GPP

Spain
2016
20 m
DAVITS Model GPP

Spain
2016
20 m
DAVITS Model GPP

Spain
2016
20 m
Gantry Model GT

Ireland
2017
50 m
Gantry Model GT

Ireland
2017
50 m
Gantry Model GT

Ireland
2017
50 m
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units

