Our Projects
BMU Model GPN
USA
Applied in 2019
120 mof height



Technical challenge
The project required the replacement of two existing machines that operated without rails and parked in a garage with reduced dimensions. Being a constructed building, it required that the design of the machines be made with parts of appropriate size and weight to lift them by the building's elevator.
Our solution

Technical challenge
The project required the replacement of two existing machines that operated without rails and parked in a garage with reduced dimensions. Being a constructed building, it required that the design of the machines be made with parts of appropriate size and weight to lift them by the building's elevator.
Our solution
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units
© 2012-2025 GPBMU Building Maintenance Units






