height Date Units Location
40m 2016 3 Middle East

Technical challenges:

The project was determined by the weight limitation set by our customer. Also, the area where the machine had to operate was really narrow and the parapet had different heights.

Our solution:

Our engineers conceive a very compact machine able to operate on a very narrow concrete path.

The counterweight was designed to swing so that the different obstacles in the roof could be avoided easily.

The BMU was also equipped with multiple accessories such as anemometer, cable reel, walkie talkie, extinguisher…

Manufacturing and installation

BMU cleaning the facade