Group of facade access solutions – France
- Height: 76 m
- Date: 2011
- Units: 3
- Location: Europe
Technical Challenges:
The size of this emblematic building demanded the installation of multiple BMUs to be able to guarantee the access to all the façades.
The gondola had to provide a long reach while moving through an area with limited space for the machine box and counterweights.

INSTALLATION
BMU in Operation
Our solution:
Our engineers designed a system that combined several davits with a bespoke GPI model for the narrow traversing area in the roof. The BMU was customized to work on the rails of the replaced bmu.
