BMU replacement North – America

  • Height: 80 m (260 feet)
  • Date: 2016
  • Location: North America

Technical Challenges:

The replacement of the two machines in the building had to be carried out without the use of cranes. That is why our solution should allow the disassembled of the different parts.

On the other hand, the characteristics of the building´s roof forced that the BMUs (building maintenance units) were light and that could move on an angular guide.

BMU Replacement

Manufacturing and installation

BMU in operation

Our solution:

As seen in the images, the two GPNs were designed to be disassembled and loaded into the elevators.

In addition, the BMU was adapted to work with the old system of fixation, which meant a significant saving for the client.

BMU Replacement

Other Projects

Davit system

Góndola (BMU)-Hotel in Europe

BMU installation in hotel

Gondola facade maintenance

BMU project for new hotel

Contact Us

C/ La Venta, 25. 28880, Meco (Madrid), Spain

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies