Height Date Units Location
76m 2011 3 Europe

Technical challenges:

The size of this emblematic building demanded the installation of multiple BMUs to be able to guarantee the access to all the façades.

The gondola had to provide a long reach while moving through an area with limited space for the machine box and counterweights.

Our solution:

Our engineers designed a system that combined several davits with a bespoke GPI model for the narrow traversing area in the roof. The BMU was customized to work on the rails of the replaced bmu.

Góndola and davit