Height | Date | Units | Location |
76m | 2011 | 3 | Europe |
Technical challenges:
The size of this emblematic building demanded the installation of multiple BMUs to be able to guarantee the access to all the façades.
The gondola had to provide a long reach while moving through an area with limited space for the machine box and counterweights.
Our solution:
Our engineers designed a system that combined several davits with a bespoke GPI model for the narrow traversing area in the roof. The BMU was customized to work on the rails of the replaced bmu.