Height Date Location
20 m 2016 Madrid

Technical Challenges:

The solution designed by GPBMU had to give access to the floor of an inner courtyard.

The multiple obstacles of the roof and the small space made this building a challenge for safety.

Our solution:

The Davit designed allowed the rotation of the basket manually and thanks to its height, it was able to avoid the parapet safety. Despite its higher cost, the davit was an improvement in safety and comfort compared to other solutions such as rope access.

Manufacturing and installation

BMU in operation