BMU installation in hotel – Europe
Height Date Location 50 metres 2016 Europe Technical challenges: The installation of the BMU was required many years after the building construction and therefore we had to deal with a roof full of obstacles (chillers, chimneys, elevator room…) this demanded a...
Group of facade access solutions – France
Height Date Units Location 76m 2011 3 Europe Technical challenges: The size of this emblematic building demanded the installation of multiple BMUs to be able to guarantee the access to all the façades. The gondola had to provide a long reach while moving through an...
Góndolas in an office – Europe
Height Units Date Location 40 – 70 metres 2 2015 Europe Technical challenges: The complexity in this project was coming from difficult-access-facades and from the multiple cantilevers. Also, the traversing movements of our roof car had to be made through narrow...