Davit system – Spain

Davit system – Spain

Height Date Location 20 m 2016 Madrid Technical Challenges: The solution designed by GPBMU had to give access to the floor of an inner courtyard. The multiple obstacles of the roof and the small space made this building a challenge for safety. Our solution: The Davit...
BMU replacement – North America

BMU replacement – North America

Height Date Location 80 m (260 pies) 2016 North America Technical challenges: The replacement of the two machines in the building had to be carried out without the use of cranes. That is why our solution should allow the disassembled of the different parts. On the...
BMU project for new hotel – Middle East

BMU project for new hotel – Middle East

height Date Units Location 40m 2016 3 Middle East Technical challenges: The project was determined by the weight limitation set by our customer. Also, the area where the machine had to operate was really narrow and the parapet had different heights. Our solution: Our...
BMU’s for commercial buildings- America

BMU’s for commercial buildings- America

Height Date Units Location 110 metros 2012 2 America Technical challenges Inward sloping facades. The inward sloping facade of one of the buildings demanded a design that could be efective on this kind of designs. Heliport The roof of the bilding counted with an...
BMU installation in hotel – Europe

BMU installation in hotel – Europe

Height Date Location 50 metres 2016 Europe Technical challenges: The installation of the BMU was required many years after the building construction and therefore we had to deal with a roof full of obstacles (chillers, chimneys, elevator room…) this demanded a...

Uso de cookies

Este sitio web utiliza cookies para que usted tenga la mejor experiencia de usuario. Si continúa navegando está dando su consentimiento para la aceptación de las mencionadas cookies y la aceptación de nuestra política de cookies, pinche el enlace para mayor información.

ACEPTAR
Aviso de cookies